We have a slab

The weather fined up in time to poor the slab on Friday. The weekend shall be spent keeping the slab wet so that it dries slowly and hopefully avoids any cracking.
There is approximately a 3 week curing period before the final cutting and polishing of the slab is done and then the frame goes up. The current plan is to erect the roof frame on sight during the slab curing stage, and then hoist it into place once the frame goes up.